皇家堵场hjdc111-皇家赌场登录网址

President of Afghanistan Witnesses the Signing of Contract for Road Repair and Renovation Project in Afghanistan by CRBC

Chinese Premier Li Keqiang and President of the Philippines Rodrigo Duterte inaugurated the projects undertaken by CRBC in Philippines

Senegal President Macky Sall Visits THIES-TOUBA Toll Expressway Project

CRBC President Du Fei Visits Alpha Condé President of the Republic of Guinea

Tajikistan President Praises Shura-Angelo Road Rehabilitation Project undertaken by CRBC

News Releases
  •   07/31/2020

    Zhang Xiaoyuan Meets with Serbian President

    On July 27, Zhang Xiaoyuan, Deputy General Manager of CRBC, visited Serbian President Aleksandar Vu?i? at the presidential palace in Serbia. Also present at the meeting were Serbian Deputy Prime Minister and Minister of Transport Zorana MIHAJLOVI? and Chinese Ambassador to Serbia Chen Bo.
  •   07/30/2020

    Concrete Beam of the First Tower Area of Peljesa? Bridge Placed

    Recently, the concrete beam section ("Block 0") of the first tower area of the Peljesa? Bridge Project in Croatia has been successfully placed, marking that the bridge has entered the upper structure construction stage.
  •   07/27/2020

    First Box Girder of Phnom Penh-Sihanoukville Expressway Cast

    On July 18, the first cross-line box girder of the Phnom Penh-Sihanoukville Expressway Project in Cambodia was successfully cast.
  •   07/18/2020

    State Secretary Inspects the Phnom Penh-Sihanoukville Expressway

    On 16 July, Yith Bunna, State Secretary of the Ministry of Public Works and Transportation of Cambodia, visited the Phnom Penh-Sihanoukville Expressway Project.
  •   07/17/2020

    Kenyan SGR Resumed Passenger Train Operation

    On July 13, the passenger train of Mombasa-Nairobi Section of Kenyan SGR officially resumed operation after 97 days of suspension due to the outbreak of COVID-19, and 967 passengers were transported on that day.
  •   07/16/2020

    Director of CEDD Inspects Tseung Kwan O Cross-Bay Bridge

    On July 13, Mr. LAU Chun-kit, Ricky, JP. Director of Civil Engineering and Development of Hong Kong, inspected the fourth concrete box girder erection of the Tseung Kwan O Cross-Bay Bridge Project with a team of 38 members, including nine deputy department officials.
Total: 1222  Head Prev Next Tail   1 / 204  To   GO 
XML 地图 | Sitemap 地图